A fictional coastal-to-upland municipality used to demonstrate how a Climate and Disaster Risk Assessment is assembled, visualised, and carried into a Comprehensive Land Use Plan.
Demo dataProvince of Maharlika · 3rd class municipality · plan period 2026–2035
Demo data
Every figure, boundary, and risk score on this page is invented for teaching purposes. The Municipality of Bayanihan does not exist, and none of these numbers describe any real Philippine locality. The base map is real OpenStreetMap tiling, but the demo boundaries drawn on top of it are not real barangay boundaries and their position is arbitrary — they say nothing about the actual places underneath.
Workspace summary
Population
68,420
Population exposed
41,660
Buildings exposed
11,000
Barangays assessed
10 of 10
Critical facilities
11 of 12 exposed
Farmland in hazard areas
5,674 ha
Road network assessed
113.4 km
Decision areas
6
Risk map
Toggle layers, choose a hazard, and click a barangay to open its assessment.
Low / Neutral
Medium
High
Very High
Map layers
The base map stays on. Overall risk takes precedence over hazard shading when both are selected.
River overflow and rainfall ponding along the demo floodplain. In a real CDRA this layer comes from an agency-issued flood susceptibility map plus local flood-mark validation.
Filter by risk class
Loading demo map…
Barangay Baybay — demo assessment
Profile
Classification
Urban
Land area
7.1 km²
Population
9,640
Households
2,210
Dominant land use
Coastal settlement and fish landing
Overall risk
Very High
Exposure database
Population exposed
8,870
Buildings
1,980
Critical facilities
6
Road length
12.9 km
Agricultural area
34 ha
Business establishments
168
Hazard susceptibility
FloodingHigh
Rain-induced landslideNot significant
Storm surgeVery High
Severe windHigh
Drought / dry spellNot significant
Slope instabilityNot significant
Risk scores by sector and hazard (demo)
Exposure sector
Hazard
Risk class
Basis
Population
Storm surge
Very High
Demo households within 100 m of the shoreline.
Urban Use Areas
Storm surge
Very High
Fish landing and adjacent housing.
Critical Point Facilities
Storm surge
High
Elementary school used as evacuation centre is itself exposed.
Lifeline Utilities
Flooding
High
Coastal road overtopped in the demo scenario.
Population exposed by barangay
Bars are coloured by the barangay's overall demo risk class.
Decision areas and chosen options
Step 5 of the assessment. Each finding ends with one of the four risk management options.
Very HighAvoid
Coastal settlement exposed to storm surge
Baybay
Demo households and the fish landing sit inside the highest surge advisory zone, and the designated evacuation centre is itself exposed.
Planned response: Designate the shoreline strip as a no-build buffer in the demo CLUP, identify an inland relocation receiving area, and re-site the evacuation centre.
Very HighReduce
Upland households on unstable slopes
Mapagmahal, Bundok
Demo settlements sit on slopes above 30 percent with a single access road crossing an unstable cut.
Planned response: Slope protection on the access road, early-warning rain gauges, and a managed phase-out of new residential permits in the steepest demo blocks.
HighReduce
Flooding of the commercial core
Poblacion, San Roque
The demo market and municipal offices flood in the modelled event, interrupting services and trade.
Planned response: Drainage upgrade, elevated ground floors for new permits, and continuity arrangements for demo municipal services.
HighTransfer
Agricultural production losses
Malinao, Masagana, Katipunan, Bagong Silang
Demo ricefields and ponds flood in the wet season while rainfed farmland loses yield in dry spells.
Planned response: Enrol demo farmers and fisherfolk in crop and fisheries insurance, paired with water-impounding and drought-tolerant varieties.
MediumReduce
Wind damage to light-material housing
Bagong Silang, Baybay
A high share of demo dwellings use light materials and lose roofing in severe wind.
Planned response: Housing retrofit assistance and enforcement of demo building standards on roof fastening.
MediumAccept
Dry-spell stress on small water systems
Katipunan, Bagong Silang
Demo Level I and II water systems fall short during extended dry spells.
Planned response: Monitor demo yields and keep a water-hauling contingency while a longer-term source study is programmed.
Report preview
Demo data
What the assessment hands to the plan: a prioritised list of interventions with a timeframe and a lead office. Downloadable report generation is on the roadmap below.
Intervention
Type
Addresses
Timeframe
Lead office
Coastal no-build buffer and relocation receiving area
Policy
Coastal settlement exposed to storm surge
Short (1–3 yrs)
MPDO / Sangguniang Bayan (demo)
Re-sited and elevated evacuation centre
Structural
Coastal settlement exposed to storm surge
Medium (4–6 yrs)
MDRRMO (demo)
Slope protection on Bundok Mountain Road
Structural
Upland households on unstable slopes
Medium (4–6 yrs)
Municipal Engineering (demo)
Community rain-gauge early warning network
Non-structural
Upland households on unstable slopes
Short (1–3 yrs)
MDRRMO (demo)
Poblacion drainage master plan and upgrade
Structural
Flooding of the commercial core
Long (7–10 yrs)
Municipal Engineering (demo)
Elevated-floor condition on new permits in flood-prone blocks
Policy
Flooding of the commercial core
Short (1–3 yrs)
Building Official (demo)
Crop and fisheries insurance enrolment drive
Non-structural
Agricultural production losses
Short (1–3 yrs)
Municipal Agriculture Office (demo)
Small water-impounding projects and drought-tolerant varieties
Structural
Agricultural production losses
Medium (4–6 yrs)
Municipal Agriculture Office (demo)
Housing retrofit assistance for light-material dwellings
Non-structural
Wind damage to light-material housing
Medium (4–6 yrs)
MSWDO (demo)
Barangay CDRA orientation and data-collection training
Capacity
Dry-spell stress on small water systems
Short (1–3 yrs)
MPDO (demo)
Costs are deliberately left uncosted — a real investment programme prices each item against actual unit costs and available funds.
Lifeline utilities — road segments (demo)
Segment
Class
Disruption risk
Maharlika National Road (demo)
National
Medium
Coastal Municipal Road (demo)
Municipal
High
Bundok Mountain Road (demo)
Municipal
Very High
Masagana Farm-to-Market Road (demo)
Barangay
High
Critical point facilities (demo)
Facility
Type
Exposed to
Bayanihan Municipal Hall (demo)
Government
Flooding
Bayanihan Rural Health Unit (demo)
Health
Flooding
Poblacion Central School (demo)
School
Flooding
Baybay Elementary School (demo)
School
Storm surge, Flooding
Baybay Evacuation Centre (demo)
Evacuation Centre
Storm surge
Malinao Barangay Health Station (demo)
Health
Flooding
Mapagmahal Barangay Hall (demo)
Government
Rain-induced landslide
Bayanihan Water District Pump (demo)
Water
Flooding, Drought / dry spell
Bundok Watershed Substation (demo)
Power
Slope instability
Masagana High School (demo)
School
Flooding
Sampaguita Health Station (demo)
Health
Flooding
San Roque Evacuation Centre (demo)
Evacuation Centre
Not exposed
Coming soon
What a working LGU workspace will add
This demo is read-only. These capabilities would turn it into a tool an LGU could run its own assessment in.
LGU accounts and workspaces
Each LGU gets a private workspace with its own users and permissions.
GIS data upload
Upload shapefiles and GeoJSON boundaries to replace demo geometry.
Barangay data collection forms
Structured forms so barangays can submit exposure data directly.
Hazard layer upload
Bring in agency-issued hazard maps and overlay them on your own boundaries.
Exposure database builder
Guided entry for population, facilities, lifelines, and natural resources.
Collaborative review
Comment, flag, and sign off on risk findings across departments.
Automated risk calculations
Compute vulnerability and risk scores from uploaded exposure and hazard data.
Scenario modelling
Compare risk under different climate and development scenarios.
CLUP integration
Carry risk findings directly into land use and zoning workspaces.
Zoning analysis
Test proposed zoning against risk classes before adoption.
PDF report generation
Produce a formatted CDRA report from your workspace data.
GIS export
Export risk layers for use in desktop GIS software.
Data and API integration
Connect to external data services as they become available.
CDRA Philippines is an independent educational module of SmartCity.ph. It is not an official application of DHSUD, USAID, PAGASA, or any other government agency, and it is not endorsed by them. Official documents referenced here identify their issuing agency and link back to the original source. All municipal figures, maps, and risk scores shown in the demo are fictional.